Idea 02 - Test the Riskiest Assumptions First
Core Idea
Not all hypotheses are equally important. The most dangerous assumptions should be tested first.
Prioritisation Framework
Hypotheses are ranked using:
- Criticality
- Existing evidence
High-Risk Assumptions
The highest priority assumptions are:
- Critical to success
- Supported by little or no evidence
Four Risk Categories
- Desirability
- Feasibility
- Viability
- Adaptability
Key Insight
Testing low-risk assumptions first creates false progress.
Links
Reference
Strategyzer (2026) Strategyzer | Mastering Business Testing. Available at: https://www.strategyzer.com/ (Accessed: 28 May 2026).
Last Updated: 31/05/26